Illustration Payment
// Sarawak
Form B – Generic Pictures
Description
Works To Be Completed
Illustration Pictures
2(a) Foundation Works
Foundation works below lowest floor level:
Pile cap
Piling
2(b) Ground floor slab, ground floor columns.
Primary structural elements Ground floor level including:
Ground beam
Ground floor slab
Ground floor columns
2(c) First floor slab, roof beam and walls in position
Wall Position
Upper roofing
1
st
floor Internal brick wall & party wall in position
1
st
floor setting; of door or window sub-frames or opening
1
st
floor roof beam
2(d) Roofing
Top roof system installed.
Top roof truss and roof tiles installed
2(e) Internal plastering, electrical conduits (without wiring) and plumbing (without fittings).
M & E piping, sleeves in place
Plastering to walls and other surface
2(f) External plastering
Plastering external walls
2(g) Ceiling, doors and window including glazing, soil drainage, septic tank and lower roofing
Door, window in place
Sanitary wares & fittings
Ceiling installed
Lower roofing completed
Soil drainage and septic tank completed
2(h) Driveway, apron, perimeter drain, fencing and gate
Concrete to driveway, perimeter drain, apron
Fencing and gate in place
2(i) Painting and physical completion of the said building
House painted and compound or yard are clear of debris
Note: The photos are for illustration purposes and do not represent the actual construction site progress.
Form C – Generic Pictures
Description
Works To Be Completed
Illustration Pictures
2(a) Foundation Works
Foundation works below lowest floor level:
Piling & Pilecaps
Foundation slab
2(b) The reinforced concrete framework, and floor slab of the Parcel
All primary structural elements above lowest floor level including:
Beams
Columns
Suspended slabs
Structural Walls
2(c) The walls of the said Parcel with door and window frames placed in position
Non-structural wall within parcels
Party wall
Timber Door & Window Frames
2(d) The roofing/ceiling, electrical conduit (without wiring), plumbing (without fittings), gas pipings (if any) and internal telephone trunking and cabling (if any) to the said Parcel.
Floor slab or slab ceiling of the said parcel
M & E piping, sleeves in place
2(e) Internal Plastering of the said Parcel.
Plastering to walls
Floor screed and/or other floor finishes
2(f) External plastering of the said building.
Plastering of the building exterior walls and other surface.
2(g) Painting of the said Building.
Painting of the external walls and other surface.
Note: The photos are for illustration purposes and do not represent the actual construction site progress.
< Back to Corporate Website
Our Projects
Northern Region
Central Region
Southern Region
East Malaysia
International
Track Record
Site Progress
Latest Events
Events
Priority Program
Buyer's Guide
REHDA's First Home Buyers' Guide
Illustration Payment
West Malaysia
Sabah
Sarawak
RHB MyHome App
Hide dock
Show dock
Back to top
Loading