Illustration Payment
// Sabah
Schedule G – Generic Pictures
Description
Works To Be Completed
Illustration Pictures
2) On completion of foundation works of the Property.
Foundation works below lowest floor level:
Stumps
Piling & Pile caps
Raft foundation.
3) On completion of reinforced concrete framework of the Property.
All primary structural elements above lowest floor level including:
Beams
Columns
Suspended slabs
Roof Beams
4) On completion of brick walls of the Property with doors and window frames in position.
All brick wall within parcels
All party walls inclusive of wall stiffeners
Timber Door & Window Frames where there are no sub-frames
Floor slab soffits & ceiling framing
5) On completion of roofing and internal plastering of the Property.
Roof structure, roofing & flashing
All plastering to walls, soffits, slabs, beam
Wall tiles & other wall finishes
Floor screeding and/or other floor finishes
Painting to internal & external walls, floors and ceilings
6) On completion of electrical wiring and plumbing (without fittings) of the Property.
Electrical wiring
Water piping
Sanitary piping
Telephone trunking & cabling
7) On completion of the roads, drains and sewerage works serving the Property.
Paved Road leading to building containing the said parcel from an existing road.
Permanent roads around the building containing the said parcel
Entrance culvert serving the building Kerbs
Drains & Main Drains connected to outfall
Sewerage works including manholes from the building connected to a completed sewerage treatment system
Note: The photos are for illustration purposes and do not represent the actual construction site progress.
Schedule H – Generic Pictures
Description
Works To Be Completed
Illustration Pictures
2(a) The work below ground level including piling and foundation of the Building comprising the said Parcel
Foundation works below lowest floor level:
Stumps
Piling & Pile caps
Raft foundation.
2(b) The reinforced concrete framework and floor slab of the Parcel.
All primary structural elements above lowest floor level including:
Beams
Columns
Suspended slabs
Structural Walls
Roof Beams
2(c) The walls of the Parcel with door and window frames placed in position.
All non-structural wall within parcels
All party walls inclusive of wall stiffeners
Timber Door & Window Frames where there are no sub-frames
All frameworks for dry partitioning excluding lining of partition.
2(d) The roofing/ceiling, electrical wiring, plumbing (without fittings), gas piping (if any) and internal telephone trunking and cabling to the Parcel.
Roof structure, roofing & flashing
Floor slab soffits & ceiling framing of the said parcel
Electrical wiring within parcel
Water piping within parcel
Sanitary piping within parcel
Telephone trunking & cabling within parcel
2(e) The internal and external plastering of the Parcel.
All plastering to walls, soffits, slabs, beam, columns where specified
Wall tiles & other wall finishes
Linings, boards and panels to framed partitions
Floor screeding and/or other floor finishes
Painting to internal & external walls, floors and ceilings (if any)
2(f) The sewerage works serving the Building.
Sewerage works including manholes from the building containing the said parcel connected to a completed sewerage treatment system
2(g) The drains serving the Building.
Drains & Main Drains connected to outfall
2(h) The roads serving the Building.
Paved Road leading to building containing the said parcel from an existing road.
Permanent roads around the building containing the said parcel
Entrance culvert serving the building
Kerbs
Note: The photos are for illustration purposes and do not represent the actual construction site progress.
< Back to Corporate Website
Our Projects
Northern Region
Central Region
Southern Region
East Malaysia
International
Track Record
Site Progress
Latest Events
Events
Priority Program
Buyer's Guide
REHDA's First Home Buyers' Guide
Illustration Payment
West Malaysia
Sabah
Sarawak
RHB MyHome App
Hide dock
Show dock
Back to top
Loading